Monday, May 17, 2010
at
8:52 PM
|
2
comments - [Click to post comment]
Just thought I'd post some prop updates on the next track level which features an industrial powerplant-nuclear feel to it which will be rearranged later. Decided to go on smaller building blocks for the buildings as it'll allow me to scale the size of the level easily. The track is meant to be surrounded by industrial like complexes. So expect lotsa labyrinthine tube like old machinery for the level.
Posted by
Prometheus